- Model: stone-guard
STONE GUARD
High performance, eco friendly, water based, impregnating sealer to protect natural stone against stains.
- Excellent stain-proofing properties on polished materials.
- Provides in-deepth water repellency
- Provides oleo-repellency and hydro-repellency to the surface of polished materials.
- Protects material from rising damp
- Prevents the formation of salts and efflorescence
- Water-based product
- DEco-compatible solution
- VOC Free
- Suitable for contact with foods
- Does not change the original appearance of the treated surface
- Does not film
- High capacity to penetrate into the subfloor
- Durable protection
- Simplifies grout removal and cleaning after installation
- Does not change breathability
This product can be used on both indoor and outdoor surfaces.
Suitable for use on: Marble, granite, limestone, sandstone, slate, basaltina, quarzite, porphyry, travertine, marble-cement agglomerate, marble-resin agglomerate.
COVERAGE: 10/15 m2/l
APPLICATION EQUIPMENT: Brush, Lambswool applicator, Roller, Airless, Immersion, Production li
PORCELAIN TILES
If your tiles are in stock we deliver within 3-4 days. At busy times this may be a day or two more but you will always be notified before. If your order is urgent please contact us first and we can arrange alternative fast track delivery service at a cost.
If your tiles are not in stock the delivery time is usually 7-9 business days. You will always be notified with the exact date after your order. At busy time
*All deliveries are by third party with Moffet or tail lift truck depending on your order. We may arrange direct delivery with Artic truck if you have forklift on site to reduce delivery cost. We will always share this information with you and agree on particulars first.
NATURAL STONES
Ready standard tiles are delivered within 3-4 weeks. This is because we cut all orders from slabs usually to enable choice of sizes.
Bespoke production will be discussed with you to be delivered on an agreed time frame. If the slabs are available we can cater for planned production within 2 weeks for developments as priority.