- Model: UMS0161010
- EAN: 8032634204150
Available Options
- 75cm X 37,5cm Porcelain Tiles
- 75cm X 75cm Porcelain Tiles
- 100cm X 100cm Porcelain Tiles
- 150cm X 75cm Porcelain Tiles
- 150cm X 100cm Porcelain Tiles
- 150cm X 150cm Porcelain Tiles
- 300cm X 100cm Porcelain Tiles
- 300cm X 150cm Porcelain Tiles
BlacknWhite. Unfading, dynamic, versatile!
Ice Maximum is a contemporary full body porcelain tile that is as hard as a natural stone material because of its engineered ingredients. The Ice Maximum is a versatile porcelain tile that can be used in a variety of spaces ranging from minimalist to modern, it will bring endless elegance to any space. Ice Maximum forms part of the Datuani Series, I is available in eight sizes and in two surface finishes.
No slip-sleek.
The honed finish offers some grip when walking in wet areas such as wet rooms or swimming pools. The bright finish on the other hand has a beautifully shined surface, not recommended for wet rooms or swimming pools.
Tile Thickness: 6mm
Surface Finishes: Honed and Bright
PORCELAIN TILES
If your tiles are in stock we deliver within 3-4 days. At busy times this may be a day or two more but you will always be notified before. If your order is urgent please contact us first and we can arrange alternative fast track delivery service at a cost.
If your tiles are not in stock the delivery time is usually 7-9 business days. You will always be notified with the exact date after your order. At busy time
*All deliveries are by third party with Moffet or tail lift truck depending on your order. We may arrange direct delivery with Artic truck if you have forklift on site to reduce delivery cost. We will always share this information with you and agree on particulars first.
NATURAL STONES
Ready standard tiles are delivered within 3-4 weeks. This is because we cut all orders from slabs usually to enable choice of sizes.
Bespoke production will be discussed with you to be delivered on an agreed time frame. If the slabs are available we can cater for planned production within 2 weeks for developments as priority.